Horse Racing Forum - PaceAdvantage.Com - Horse Racing Message Board

Go Back   Horse Racing Forum - PaceAdvantage.Com - Horse Racing Message Board


View Single Post
Old 03-15-2018, 07:19 PM   #15
davew
Registered User
 
Join Date: May 2011
Posts: 22,649
The bridge walkway was still under construction and not open to public for another month or so. There seems to be overkill on construction for a people overpass. There were 4-6 workers on top of the bridge. Some are saying there was supposed to be a center support that was not in place yet.

It reminds me of the I-5 interstate chunk that fell in the river near Mt Vernon, WA. A truck with an oversized load hit the corner of the overhead span and moved the center support enough for a freeway section to drop (which were just butt joints on top of a support).
davew is online now   Reply With Quote Reply
 
» Advertisement
» Current Polls
Wh deserves to be the favorite? (last 4 figures)
Powered by vBadvanced CMPS v3.2.3

All times are GMT -4. The time now is 02:48 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Copyright 1999 - 2023 -- PaceAdvantage.Com -- All Rights Reserved
We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program
designed to provide a means for us to earn fees by linking to Amazon.com and affiliated sites.