Horse Racing Forum - PaceAdvantage.Com - Horse Racing Message Board

Go Back   Horse Racing Forum - PaceAdvantage.Com - Horse Racing Message Board


View Single Post
Old 10-18-2018, 08:00 PM   #43
bobphilo
Registered User
 
Join Date: Dec 2005
Location: Palm Beach, Florida
Posts: 2,465
Quote:
Originally Posted by cj View Post
In all methods studied, the projection method to determine the expected time of a race is key to the process of calculating a variant. The systems that interpret the horses' times to project the expected times or figures (Beyers, TimeformUS, T-Graph, The Sheets) are taking into account which are the most representative of a horse's past races to get this and take into account the various factors involved in weighing the importance of these races. The totally computer generated systems (Brisnet, Equibase) are simply averaging the horses past races without regard to human interpretation of which races are most representative of a horses' ability to give more weight to.

While the methods that are completely computer generated without human intervention are less prone to human error, IMO, the systems that take into account which past races are most representative and weigh them accordingly produce more accurate projections and ultimately, more accurate final figures.

Last edited by bobphilo; 10-18-2018 at 08:03 PM.
bobphilo is offline   Reply With Quote Reply
 
» Advertisement
» Current Polls
Which horse do you like most
Powered by vBadvanced CMPS v3.2.3

All times are GMT -4. The time now is 12:37 PM.


Powered by vBulletin® Version 3.8.9
Copyright ©2000 - 2024, vBulletin Solutions, Inc.
Copyright 1999 - 2023 -- PaceAdvantage.Com -- All Rights Reserved
We are a participant in the Amazon Services LLC Associates Program, an affiliate advertising program
designed to provide a means for us to earn fees by linking to Amazon.com and affiliated sites.