Quote:
Originally Posted by InsideThePylons-MW
Track guy who is super sharp and knows SA very well told me it would be minimum $5 million, and if they really wanted to do it right, close to $10 million to rip out that crap and put in a top to bottom wonderful dirt track.
I heard they want, or are prepared, to spend $3 million tops.
So don't expect much.
|
The CHRB should pay the rest. Actually, 100% of the cost.