Quote:
Originally Posted by SPEEDHORSE
Bro Raybo,
What I mean when I posted Projected Track Variant is that it should really be called the Daily Track Variant. This daily variant was derived, as a result of the Projection Method in calculating variants, based on projected speed figures.
I hope I had corrected myself from the confusion I have made in my earlier post.
|
Still a little confused about "projecting" variants. I get the part about projecting speed figures, but the daily variant projections seem strange to me, just don't see how it is possible. Are we assuming that today's variant will be the same as some day in the past?
"Projecting" to me means "predicting", by the way, maybe that's the confusion?